
Note: both the inner vertical wall and inner top panel connect to the firewall.
Still need to fabricate an access cover for the inner top panel to gain access to the pedal box and brake bias bar once the foot box is finally assembled.
I found the best assembly sequence to be; drop floor, inner and outer top panels, inner vertical wall, front panel and finally outer vertical wall.
After speaking with the guys at Factory Five on Friday, hopefully many of the back ordered items will ship this week.
No comments:
Post a Comment