Saturday, November 7, 2009

She Runs! Day 2 objective completed

Another day of great progress, all break lines installed and the brakes bled, more sheet metal, steering column installed, as was the engine and transmission. Radiator and coolant hoses added, more sheet metal, full electrical harness, battery box and you guessed it - more sheet metal. Engine fired successfully after a little fault finding. The really cool part of today was three local roadster owners tuned up for lunch.

No comments:

Post a Comment